We flipped the 1920 Smith Island skiff for bottom work. We reefed the seams (pulled out old caulking), sanded the plugs, and set old nails. We also mixed West System epoxy with 410 filler to make a putty to fair the rough spots.




We flipped the 1920 Smith Island skiff for bottom work. We reefed the seams (pulled out old caulking), sanded the plugs, and set old nails. We also mixed West System epoxy with 410 filler to make a putty to fair the rough spots.



