This Week’s Tasks:
- Finish CG floors.
- Install CG sign boards.
- Install ducker tiller.
- Find the ducker rig and decide permanent storage place.
- Remove port side planks from power skiff.
- Build movable partition and small table for BL parts in the corn crib storage area
- Make a plan to remove BL foremast.
Supplies on Order
- Brush head for Ridgid vac, 2″ inside dia.
- 1 plywood sheet, 4 2×3/8′ for moveable partition and table in corn crib for Bessie Lee parts.
- Plank stock for power skiff.
——-
Cinnamon Girl
Work done last week:
- Sam led a demo and discussion of leatherwork for CG’s mast partners and other bearing points on spars.
- CG’s original builder, Kevin Brennan, was at the shipyard with family and friends and stopped by to admire our work on GG.
This week:
- Finish the floors
- Install the sign boards.
After that:
- Fashion and install mast/sprit cleats
- Move to the floating dockLaunch in two weeks?
- Measure, design, and install cockpit cover


Delaware Ducker
Work done last week:
Willem took home stock to fashion the tiller.
This Week:
- Install tiller
- Find the rig and decide permanent storage place
After That:
- Measure, design, and install cockpit cover
- Make dock roller to prevent damage during launch/recovery
- Move to the floating dock



Smith Island Power Skiff
Work done last week:
On hold.
This week:
- Remove bad planks on port side
After that:
- Decide about replacing bottom planks
Bessie Lee
Work done last week:
- On hold.
This week:
- Build movable partition in the corn crib storage area to discourage removal
- Make a plan to remove the foremast (limited head room)
After that:
- Publish objectives, work plan, and schedule.

Poling Skiff
Next:
Publish objectives, work plan, and schedule.