Bob and Jim did touch-up on the bungs that cover the nails which secure the floor frames to the bottom of the 1920 skiff.
Sam briefed us on upcoming projects. We discussed plans for a supply cabinet to be installed on the SBS porch. Tom ran to the Lumberyard for those materials, then Bob and Tom cut the plywood panels on the boat shop.
Willem and Jenn power washed the push boats; we start scraping and painting them next week.
