We loaded the 1925 skiff for shipment to the CBMM Easton facility, where the vessel’s lines will be taken off to prepare for drawing and fully documenting it for the first time.





We loaded the 1925 skiff for shipment to the CBMM Easton facility, where the vessel’s lines will be taken off to prepare for drawing and fully documenting it for the first time.




